SR 400 (SBL) over NANCY CREEK

IN N ATLANTA · County 121, Georgia · Built 1992 · 3 Lanes · 21,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012107480
Year Built
1992
Length
128.6 m (421.9 ft)
Max Span
31.7 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
21,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,099,000
Total Project Cost
$3,148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.