HUFF ROAD over NS RAILROAD (638487C)

IN N ATLANTA · County 121, Georgia · Built 1955 · 2 Lanes · 9,660 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000012104040
Year Built
1955
Length
27.4 m (89.9 ft)
Max Span
11.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
9,660
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.