WESTVIEW DRIVE over I-20

IN W ATLANTA · County 121, Georgia · Built 1965 · 2 Lanes · 2,760 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012103890
Year Built
1965
Length
205.7 m (674.9 ft)
Max Span
61.3 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
2,760
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,637,000
Total Project Cost
$3,956,000