GORDON STREET over ATLANTA BELTLINE

IN W ATLANTA · County 121, Georgia · Built 1906 · 5 Lanes · 11,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012100820
Year Built
1906
Length
10.7 m (35.1 ft)
Max Span
5.5 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
11,600
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$249,000
Total Project Cost
$373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.