AIRPORT BOULEVARD over I-85- I-85 RAMP NB

IN COLLAGE PARK · County 121, Georgia · Built 1979 · 5 Lanes · 10,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012103830
Year Built
1979
Length
126.2 m (414 ft)
Max Span
36.6 m
Width
26.1 m (85.6 ft)
Lanes
5
Daily Traffic
10,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,941,000
Total Project Cost
$4,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.