NORTHSIDE DR (SBL) over I-285 (SR 407)

IN N ATLANTA · County 121, Georgia · Built 1962 · 3 Lanes · 3,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012103270
Year Built
1962
Reconstructed
1987
Length
87.8 m (288.1 ft)
Max Span
27.4 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
3,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,432,000
Total Project Cost
$2,148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.