COLUMN DRIVE EBL over SOPE CREEK

7 MILES SOUTH EAST OF MAR · County 067, Georgia · Built 1974 · 1 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006750750
Year Built
1974
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
2,047
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000
Total Project Cost
$435,000