CASCADE ROAD over SOUTH UTOY CREEK

6.8 MI W OF ATLANTA · County 121, Georgia · Built 1985 · 5 Lanes · 88,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012100910
Year Built
1985
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
88,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$568,000
Total Project Cost
$852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.