CASCADE ROAD over CSX RAILROAD

7.4 MI W OF ATLANTA · County 121, Georgia · Built 1971 · 4 Lanes · 21,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012100900
Year Built
1971
Length
58.5 m (191.9 ft)
Max Span
21.3 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
21,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,159,000
Total Project Cost
$1,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.