ARMUCHEE CONNECTOR over OOSTANAULA RIVER O/F

3.2 MI NE OF ROME · County 115, Georgia · Built 2011 · 2 Lanes · 9,840 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011551020
Year Built
2011
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
9,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.