SR 1 - US 27 over BIG DRY CREEK

3.2 MI NORTH OF ROME · County 115, Georgia · Built 1947 · 4 Lanes · 22,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000011500200
Year Built
1947
Reconstructed
1980
Length
62.5 m (205.1 ft)
Max Span
16.8 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
22,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,238,000
Total Project Cost
$1,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.