CALLIER SPRINGS RD over ETOWAH RIVER TRIB.
3.9 MI SE OF ROME · County 115, Georgia · Built 1972 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.210989, -85.126067
This bridge is in worse condition than 68.8% of bridges in County 115. The average bridge in Georgia is 0 years old; this one is 54 years old.
Nearby Bridges
SR 20-US 411 over ETOWAH RIVER TRIB.
Built 1957
CALLIER SPRGS RD over ETOWAH RIVER TRIB
Built 2005
CHULIO ROAD over ETOWAH RIVER TRIB.
Built 1980
SR 1 LOOP (SBL) over ETOWAH RIVER
Built 1989
SR 1 LOOP (SBL) over ETOWAH RIVER OVERFLOW
Built 1989
SR 1 LOOP (NBL) over ETOWAH RIVER OVERFLOW
Built 1989
SR 1 LOOP (NBL) over ETOWAH RIVER
Built 1989
SR 101 over SR 20 (WBL) - US 411
Built 1961
SR 1 - US 27 (NBL) over RMP SR 20(WBL)TO SR 1 SB
Built 1966
SR 1 - US 27 (NBL) over M-3747 E. 19TH STREET
Built 1966
Bridge Details
- Structure #
- 000000011500930
- Year Built
- 1972
- Length
- 12.5 m (41 ft)
- Max Span
- 6.4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $160,000
- Total Project Cost
- $240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.