SR 101 over SR 20 (WBL) - US 411

IN SOUTH EAST ROME · County 115, Georgia · Built 1961 · 2 Lanes · 14,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000011500480
Year Built
1961
Length
60.4 m (198.2 ft)
Max Span
21.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
14,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$774,000
Total Project Cost
$1,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.