CLARENCE MARTIN RD over SOWHATCHEE CREEK

8.5 MI OF SW OF BLAKELY · County 099, Georgia · Built 1970 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009950080
Year Built
1970
Reconstructed
2009
Length
45.7 m (149.9 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000