BRIDGE ROAD over SWEETWATER CREEK

7.9 MI E OF DOUGLASVILLE · County 097, Georgia · Built 1978 · 2 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009700440
Year Built
1978
Length
57.6 m (189 ft)
Max Span
19.2 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
11,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$738,000
Total Project Cost
$1,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.