I-20 over SWEETWATER CREEK

7.7 MI E OF DOUGLASVILLE · County 097, Georgia · Built 1962 · 6 Lanes · 117,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009700250
Year Built
1962
Reconstructed
1979
Length
91.4 m (299.9 ft)
Max Span
22.9 m
Width
42.2 m (138.5 ft)
Lanes
6
Daily Traffic
117,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,451,000
Total Project Cost
$3,676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.