RIVERSIDE PARKWAY over SWEETWATER CREEK

8.2 MI E OF DOUGLASVILLE · County 097, Georgia · Built 1972 · 2 Lanes · 7,440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009700350
Year Built
1972
Length
85.3 m (279.9 ft)
Max Span
21.3 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
7,440
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,094,000
Total Project Cost
$1,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.