HARBIN ROAD over SOUTH UTOY CREEK

IN W ATLANTA CITY LIMIT · County 121, Georgia · Built 1920 · 2 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000012151280
Year Built
1920
Length
9.1 m (29.9 ft)
Max Span
3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,047
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.