EASTMAN-RHINE HWY over SUGAR CREEK

1.8 MI S OF EASTMAN · County 091, Georgia · Built 2007 · 2 Lanes · 3,720 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009150220
Year Built
2007
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,720
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.