EASTMAN-SOPERTON over GUM SWAMP CREEK

2.4 MI E OF EASTMAN · County 091, Georgia · Built 1992 · 2 Lanes · 3,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009100380
Year Built
1992
Length
92.7 m (304.1 ft)
Max Span
11.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,750
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,188,000
Total Project Cost
$1,782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.