REDWING DRIVE over I-285 AND RAMPS
6.5M SE OF DECATUR · County 089, Georgia · Built 2022 · 2 Lanes · 2,510 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.750661, -84.231536
This bridge is in worse condition than 33.7% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 4 years old.
Nearby Bridges
COVINGTON HIGHWAY over I-285 (SR 407)
Built 2022
INDIAN CREEK ROAD over SNAPFINGER CREEK TRIB
Built 1960
REDAN ROAD over I-285 (SR 407)
Built 1966
GLENWOOD ROAD over I-285 (SR 407)
Built 2023
REDAN ROAD over SNAPFINGER CREEK
Built 1940
GLENWOOD ROAD over COBB CREEK
Built 1963
COBBS FERRY over COBB CREEK
Built 1975
PEACHCREST ROAD over COBB CREEK
Built 1960
ROWLAND ROAD over INDIAN CREEK
Built 1963
KENSINGTON ROAD over MARTA
Built 1991
Bridge Details
- Structure #
- 000000008951810
- Year Built
- 2022
- Length
- 97.2 m (318.9 ft)
- Max Span
- 49.1 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,510
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $28,342,000
- Total Project Cost
- $42,513,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.