I-20 over LITHONIA INDUSTRIAL BLVD
2.5 MI SW LITHONIA · County 089, Georgia · Built 2004 · 6 Lanes · 141,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.703503, -84.130814
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 22 years old.
Nearby Bridges
HILLANDALE ROAD over POLE BRIDGE CREEK
Built 1962
I-20 over POLE BRIDGE CREEK
Built 1959
HILLANDALE DRIVE over POLE BRIDGE CREEK
Built 2005
I-20 RAMP over POLE BRIDGE CREEK
Built 2004
I-20 TURN AROUND over I-20
Built 2004
I-20 over M-9343 EVANS MI
Built 2005
COVINGTON HIGHWAY over SWIFT CREEK
Built 1979
FAIRINGTON ROAD over I-20
Built 1959
HILLVALE ROAD over POLE BRIDGE CREEK
Built 1928
COVINGTON HIGHWAY over POLE BRIDGE CREEK
Built 1931
Bridge Details
- Structure #
- 000000008951590
- Year Built
- 2004
- Length
- 64.9 m (212.9 ft)
- Max Span
- 31.1 m
- Width
- 57.9 m (190 ft)
- Lanes
- 6
- Daily Traffic
- 141,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,740,000
- Total Project Cost
- $2,610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.