I-20 RAMP over POLE BRIDGE CREEK

1.5 MI OF LITHONIA · County 089, Georgia · Built 2004 · 2 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008951540
Year Built
2004
Length
91.1 m (298.9 ft)
Max Span
30.5 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
12,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,168,000
Total Project Cost
$1,752,000