ALVERADO WAY over COBB CREEK

2 MI SE OF DECATUR · County 089, Georgia · Built 1964 · 2 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008950090
Year Built
1964
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
2,047
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.