MAYNARD TERR. over I-20

IN ATLANTA · County 089, Georgia · Built 1992 · 3 Lanes · 5,970 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008903170
Year Built
1992
Length
56.1 m (184.1 ft)
Max Span
31.1 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
5,970
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$915,000
Total Project Cost
$1,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.