I-675 NBL over CR 139 EAST CONLEY ROAD

9 MI S OF DECATUR · County 089, Georgia · Built 1984 · 3 Lanes · 82,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902860
Year Built
1984
Length
57.3 m (188 ft)
Max Span
28.7 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
82,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$935,000
Total Project Cost
$1,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.