N/B ACCESS ROAD over N FORK PEACHTREE CREEK

3 MI S OF CHAMBLEE · County 089, Georgia · Built 1980 · 2 Lanes · 5,020 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000008901730
Year Built
1980
Length
52.1 m (170.9 ft)
Max Span
20.4 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
5,020
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$668,000
Total Project Cost
$1,002,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.