US23/ SR 155 CLAI over N FORK PEACHTREE CREEK

3.6 MI S OF CHAMBLEE · County 089, Georgia · Built 1963 · 6 Lanes · 28,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008900450
Year Built
1963
Length
50.6 m (166 ft)
Max Span
18 m
Width
24.4 m (80.1 ft)
Lanes
6
Daily Traffic
28,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,356,000
Total Project Cost
$2,034,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.