I-85 over M-9217 ACCESS RD TURN

4.2 MI SW OF CHAMBLEE · County 089, Georgia · Built 1981 · 12 Lanes · 216,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008900630
Year Built
1981
Length
58.8 m (192.9 ft)
Max Span
29.6 m
Width
52.1 m (170.9 ft)
Lanes
12
Daily Traffic
216,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,811,000
Total Project Cost
$4,216,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.