ATTAPULGUS-CLIMAX over CALLAHAN BRANCH

3.6 MI N OF ATTAPULGUS · County 087, Georgia · Built 2022 · 2 Lanes · 490 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008750680
Year Built
2022
Length
42.7 m (140.1 ft)
Max Span
18.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
490
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$12,432,000
Total Project Cost
$18,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.