EDWARDS ROAD over CSX RAILROAD

6.5 MILES NORTHWEST OF AT · County 087, Georgia · Built 1982 · 2 Lanes · 480 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008750170
Year Built
1982
Length
42.7 m (140.1 ft)
Max Span
12.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
480
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$547,000
Total Project Cost
$821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.