CR 495 over CSX RAILROAD

APP 1 MI E OF CLIMAX · County 087, Georgia · Built 1979 · 2 Lanes · 160 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008700200
Year Built
1979
Length
65.8 m (215.9 ft)
Max Span
23.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.