BROAD STREET over CSX RAILROAD

APP .5 MI W OF CLIMAX · County 087, Georgia · Built 1979 · 2 Lanes · 670 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008700190
Year Built
1979
Length
64.9 m (212.9 ft)
Max Span
21.6 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
670
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$832,000
Total Project Cost
$1,248,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.