SR 300 (NBL) over I-75

2.9 MILES SOUTHEAST OF CO · County 081, Georgia · Built 1984 · 1 Lanes · 8,360 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008100680
Year Built
1984
Length
82 m (269 ft)
Max Span
29.6 m
Width
13.7 m (44.9 ft)
Lanes
1
Daily Traffic
8,360
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$764,000
Total Project Cost
$1,147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.