WILLIFORD CROSSING over DOUBLE RUN CREEK

9 MILES EAST OF ARABI · County 081, Georgia · Built 1935 · 2 Lanes · 60 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008100510
Year Built
1935
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
60
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.