US 341/ SR 7 over CR 117

9 MI N OF ROBERTA · County 079, Georgia · Built 1966 · 3 Lanes · 1,930 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007900060
Year Built
1966
Length
56.4 m (185 ft)
Max Span
14.3 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
1,930
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$920,000
Total Project Cost
$1,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.