SR 74 over CSX RAILROAD

3.4 MI S OF SENOIA · County 077, Georgia · Built 2009 · 3 Lanes · 6,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000007751590
Year Built
2009
Length
70.4 m (231 ft)
Max Span
27.7 m
Width
18.5 m (60.7 ft)
Lanes
3
Daily Traffic
6,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,149,000
Total Project Cost
$1,723,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.