AL ROBERTS ROAD over WOLF BRANCH

@ MERIWETHER CO LINE · County 077, Georgia · Built 1993 · 2 Lanes · 640 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000007750900
Year Built
1993
Length
9.1 m (29.9 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
640
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.