I-85 (SBL) over TRANSCO GAS LINES

5 MI NE OF NEWNAN · County 077, Georgia · Built 1969 · 3 Lanes · 74,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007751360
Year Built
1969
Reconstructed
2015
Length
161.2 m (528.9 ft)
Max Span
27.4 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
74,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,631,000
Total Project Cost
$3,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.