I-85 (NBL) over TRANSCO GAS LINES

5 MI NE OF NEWNAN · County 077, Georgia · Built 1969 · 4 Lanes · 86,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007700490
Year Built
1969
Reconstructed
2015
Length
161.8 m (530.8 ft)
Max Span
27.4 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
86,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,206,000
Total Project Cost
$4,810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.