HEBRON CHURCH RD over SATILLA RIVER

9 MI SW OF DOUGLAS · County 069, Georgia · Built 1965 · 2 Lanes · 570 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000006950030
Year Built
1965
Reconstructed
2000
Length
78.9 m (258.9 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
570
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,012,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.