BAKER HIGHWAY over SATILLA RIVER TRIB.

APP 11.5 MI W OF DOUGLAS · County 069, Georgia · Built 1954 · 2 Lanes · 910 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000006900370
Year Built
1954
Length
11 m (36.1 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
910
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.