ATLANTA ROAD over I-285

3.5 MI SE OF SMYRNA · County 067, Georgia · Built 2017 · 7 Lanes · 2,510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006753590
Year Built
2017
Length
150 m (492.1 ft)
Max Span
40.2 m
Width
35.8 m (117.5 ft)
Lanes
7
Daily Traffic
2,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,734,000
Total Project Cost
$65,601,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.