NORTH CHURCH LANE over CSX RAILROAD (639138V)

4 MILES SOUTH EAST OF SMY · County 067, Georgia · Built 2009 · 3 Lanes · 6,040 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006752760
Year Built
2009
Length
16.8 m (55.1 ft)
Max Span
16.8 m
Width
16.4 m (53.8 ft)
Lanes
3
Daily Traffic
6,040
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$274,000
Total Project Cost
$410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.