CALLAWAY ROAD over WINDY HILL/MACLAND CONN.

3.6 MILES WEST OF SYMRNA · County 067, Georgia · Built 2010 · 5 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006752970
Year Built
2010
Length
40.8 m (133.9 ft)
Max Span
20.4 m
Width
27.1 m (88.9 ft)
Lanes
5
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$952,000
Total Project Cost
$1,428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.