CANDY LANE over OLLEY CREEK

3.3 MI SW OF MARIETTA · County 067, Georgia · Built 1970 · 2 Lanes · 270 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006751510
Year Built
1970
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
270
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.