SR 54 over I-75

IN MORROW · County 063, Georgia · Built 2011 · 8 Lanes · 38,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006350750
Year Built
2011
Length
97.8 m (320.9 ft)
Max Span
31.4 m
Width
39.8 m (130.6 ft)
Lanes
8
Daily Traffic
38,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.