I-75 over CR 1110 MEADOWBROOKS DR

0.7 MI S OF SR 54 · County 063, Georgia · Built 1969 · 10 Lanes · 160,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300330
Year Built
1969
Reconstructed
1991
Length
37.5 m (123 ft)
Max Span
15.8 m
Width
67 m (219.8 ft)
Lanes
10
Daily Traffic
160,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.