US129 SR10L SR15 over SR 8 US 29 W.F.TRAIL CR

1.8 MI NE OF ATHENS SQ · County 059, Georgia · Built 2023 · 2 Lanes · 50,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005950440
Year Built
2023
Length
99.1 m (325.1 ft)
Max Span
32 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
50,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.