NORTHSIDE CHEROKEE over CANTON CREEK

1.6 MI E OF CANTON · County 057, Georgia · Built 2013 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005751090
Year Built
2013
Length
110.6 m (362.9 ft)
Max Span
42.1 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,264,000
Total Project Cost
$48,396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.